The scope of the order currently stands at 63 pumps, the ten lagest having a 3350 kW motor rating each. The more than 15 metres tall SEZT pumps are made of corrosionresistant special steel, and each will deliver brine to the evaporation stations at 13.000 m3/h.
The new plant will partly operate according to the multistage flash method, partly according to the principle of reverse osmosis. One complete, it will rank among the world’s largest drinking water production plants ever built. It will produce approximately half a million cubic metres of desalinated water per day. Since the early ‚90s, KSB has acquired extensive experience in supplying equipment for seawater desalination plants.
Among others, the company supplied all pumps for the Al Taweelah B station in Abu Dhabi. The first deliveries to Fujairah will be dispatched at the end of May 2002. The last pumps to complete the order are scheduled to leave the factory in July 2002. (December 2001)
Information & Contact:
KSB Aktiengesellschaft
Johann-Klein-Strasse 9
67227 Frankenthal
Germany
Tel.: +4962 33 86 0
Fax: +4962 33 86 34 01