WATER SUPPLY
 WASTEWATER
 WATER ENGINEERING
 WATERWAYS
 HYDROPOWER
 POLITICS & LAWS
 WATER & ENVIRONMENT
 WATER & ECONOMY
 WATER & TOURISM
 WATER & MORE
 INSTITUTIONS
 SCIENCE & RESEARCH
 TECHNOLOGY
 TENDERS & SUBSIDIES
 SERVICE
 ABO


[Last update 02/07/11]








 

 Hungary
 Broken Water Main: Part of Csillaghegy (North-Buda) under Water
Budapest has been the city of broken pipes. Although the frequency of emergency cases is much lower now, because the reconstruction work is going on in the last period. But in October 2004 a water main was broken again – third time in a short period.   [more...]



 The Nagytétény Water Tower in Budapest
After 20 years the construction works of a new water tower together a 700 m water main in South-Budapest, in district Nagytétény have been started in Sepatember 2003.  [more...]



 Utility Rates Raised
With effect from January 1, 2002, water rates will be up by 6.9 percent in Budapest. The current rate of HUF 105.2 (EUR 0,42),excluding VAT, per cubic meter will be raised to HUF 112.5 (EUR 0,49), as planned.  [more...]



 Edifice and Tourist Attraction
The structure of the building was constructed between 1964 and 1966 as per the design made by Mr Gusztáv Söpkéz, an architect at MÉLYÉPTERV, government owned building company applying the sliding shuttering technology.On completion of additional works and repairs it was put into operation in spring 1968.  [more...]




[HOME]  [NEWSLETTER]  [CONTACT]  [CREDITS]
[WATER SUPPLY]  [WASTEWATER]  [WATER ENGINEERING]  [WATERWAYS]  [HYDROPOWER]  [POLITICS & LAWS]  [WATER & ENVIRONMENT]  [WATER & ECONOMY]  [WATER & TOURISM]  [WATER & MORE]  [INSTITUTIONS]  [SCIENCE & RESEARCH]  [TECHNOLOGY]  [TENDERS & SUBSIDIES]  [SERVICE]